A Stronger Standard

You can trust that when vetting subcontractors, we go above and beyond.

Our Standards

To meet Fortify Fleet’s standard, a subcontractor must submit a previously used concrete mix that:

  • Exceeded the engineer’s specified strengths when fully cured

  • Had a carbon footprint in the lowest 25th percentile

  • Included a pozzolanic material

  • Complied with the nearest low-carbon concrete code

  • Costs equal to or less than conventional concrete

We also prioritize companies that use USA-sourced and manufactured pozzolanic materials, ensuring sustainable and high-quality solutions. We’ll review mix designs, laboratory compression reports, quotes and building codes to verify suboncontractors have had successful experience using pozzolan-enhanced concrete before we list them on Fortify Fleet.

Public Benefit Corporation

As a Public Benefit Corporation, we’re in the business of making a positive impact on people and the earth.